农村规模化供水工程的水锤防护计算与研究  

Calculation and Research on Water Hammer Protection in Rural Scale Water Supply Engineering

在线阅读下载全文

作  者:祁长春 QI Chang-chun(Yingshang County Water Conservancy Project Management Office,Fuyang 236200,Anhui,China)

机构地区:[1]颍上县水利工程管理所,安徽阜阳236200

出  处:《水利科技与经济》2024年第10期26-31,37,共7页Water Conservancy Science and Technology and Economy

摘  要:以安徽省颍上县农村供水保障规划项目为实例,对农村规模化供水工程的水锤防护进行分析。首先研究供水管道水锤形成的气囊运动以及相关计算方法,并通过具体工程实例,对非稳定流工况下的水锤进行计算和分析。结果显示,在水锤防护方案中采用组合式防护,水管P-3的最大压力降低160Pa/m;管道P-149的最大压力降低280Pa/m,表明研究提出的水锤防护对管道具有较好的保护效果。This study takes the rural water supply guarantee planning project in Yingshang county,Anhui province as an example,to analyze the water hammer protection of large-scale rural water supply projects.Firstly,study the airbag motion caused by water hammer in water supply pipelines and related calculation methods.Subsequently,through specific engineering examples,the water hammer under unstable flow conditions was calculated and analyzed.The results show that the combination protection method used in the water hammer protection scheme in the study reduced the maximum pressure of P-3 water pipe by 160Pa/m;the maximum pressure of the P-149 pipeline has been reduced by 280Pa/m.The results indicate that the water hammer protection proposed in the study has a good protective effect on pipelines.

关 键 词:供水工程 水锤 气囊 防护 箱式双向调压塔 超压泄压阀 

分 类 号:TU99[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象