脱酸、脱氨塔运行中出现的问题及改造措施  

Problems and transformation measures during the operation of deacidification and deamination towers

在线阅读下载全文

作  者:王希奋 师元华 崔继华 WANG Xifen;SHI Yuanhua;CUI Jihua(Yili Xintian Coal Chemical Co.,Ltd.,Yining 835000,Xinjiang Uygur Autonomous Region)

机构地区:[1]伊犁新天煤化工有限责任公司,新疆伊宁835000

出  处:《氮肥技术》2024年第5期21-22,30,共3页Nitrogenous Fertilizer Technology

摘  要:伊犁新天煤化工有限责任公司煤制天然气项目造气装置选用碎煤加压气化炉,废水处理采用酚、氨回收工艺技术。酚氨回收装置脱酸塔、脱氨塔运行一段时间出现换热冷却效果差、工艺参数偏离正常控制范围的问题。通过对脱酸塔、脱氨塔采取碱液清洗的措施,改造后运行效果良好。Yili Xintian Coal Chemical Co.,Ltd.'s coal to natural gas project uses a crushed coal pressurized gasifier for the gas production unit,and phenol and ammonia recovery technology for wastewater treatment.The deacidification tower and deamination tower of the phenol ammonia recovery unit have been running for a period of time,resulting in poor heat exchange and cooling effects,and process parameters deviating from the normal control range.By adopting alkaline cleaning measures for the deacidification tower and deamination tower,the operation effect is good after the transformation.

关 键 词:碎煤加压气化 酚回收 脱氨塔 脱酸塔 问题 措施 效果 

分 类 号:TQ546[化学工程—煤化学工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象