检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐飞 陶俊杰 TANG Fei;TAO Junjie(Guangxi Nanning Survey and Design Institute Co.,Ltd.of Pearl River Water Resources Commission,Nanning 530007,China)
机构地区:[1]广西珠委南宁勘测设计院有限公司,广西南宁530007
出 处:《红水河》2024年第5期30-35,40,共7页
摘 要:笔者以柳州市独山水库连拱坝为研究对象,针对坝高不足、坝基及坝体渗漏等问题,结合现场实际,提出采用坝顶加高改建、坝基坝肩帷幕灌浆、连拱墩座坝体充填灌浆、连拱坝体防渗及防碳化处理等加固措施,并通过有限元法对大坝加固前后的坝体进行应力分析复核,为大坝除险加固措施方案和安全稳定运行提供有效的理论支撑依据。该研究成果可为类似中小型连拱坝除险加固提供参考。The authors take the multiple arch dam of Dushan Reservoir in Liuzhou City as the research object,aiming at the problems of insufficient dam height,dam foundation and dam body leakage,combined with the actual situation,the reinforcement measures such as dam top heightening and reconstruction,dam foundation abutment curtain grouting,multi-arch pier dam body filling grouting,multiple arch dam body seepage prevention and anti-carbonization treatment are proposed.The stress analysis and review of the dam body before and after the dam reinforcement are carried out by the finite element method,which provides an effective theoretical support for the dam reinforcement measures and safe and stable operation.The research results can provide reference for the reinforcement of similar small and medium-sized multiple arch dam.
分 类 号:TV697[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.127.127