检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵远强 ZHAO Yuanqiang(China Gezhouba Group Electric Power Co.,Ltd.,Yichang 443002,China)
机构地区:[1]中国葛洲坝集团电力有限责任公司,湖北宜昌443002
出 处:《红水河》2024年第5期61-65,共5页
摘 要:笔者针对广西沿海地区地域特点,从小孤立档和桉树基准高度两个方面对风电场35 kV集电线路的设计优化策略进行了研究。通过改进小孤立档的挂线工艺,无须考虑挂线过牵引效应,有效减少了小孤立档的终端塔用量;同时,提出一种基于桉树轮伐期确定基准树高的方法,使集电线路导线高度从常规设计的29 m降至25 m,全面降低集电线路跨越林区所需铁塔高度。研究成果可为其他具有类似地域特点的地区以及110 kV以上电压等级线路设计提供参考。According to the regional characteristics of Guangxi coastal areas the design optimization strategy of 35 kV collector line in a wind farm is studied from two aspects of small isolated span and eucalyptus benchmark height.By improving the hanging process of the small isolated span it is not necessary to consider the over-traction effect of the hanging line which effectively reduces the amount of terminal tower of the small isolated span.At the same time a method for determining the reference tree height based on the rotation period of eucalyptus is proposed which reduces the height of the collector line from 29 m to 25 m and comprehensively reduces the height of the tower required for the collector line to cross the forest area.The research results can provide reference for the design of other regions with similar regional characteristics and lines with voltage levels above110 kV.
关 键 词:集电线路 设计优化 小孤立档 桉树 风电场 广西沿海地区
分 类 号:TM752[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.157