检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶发勇 YE Fayong(China Energy Engineering Group Guangxi Electric Power Design Institute Co.,Ltd.,Nanning 530007,China)
机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,广西南宁530007
出 处:《红水河》2024年第5期100-104,共5页
摘 要:随着新能源的高速发展,广西抽水蓄能电站也将进入规模化开发建设阶段。笔者通过对广西已建或在建、拟建的10座抽水蓄能电站建设征地实物指标及征地移民补偿费用进行研究分析,归纳出广西区内抽水蓄能电站建设征地实物指标和征地移民补偿费用的主要特征,为今后开发建设区内其他类似项目提供参考借鉴。With the rapid development of new energy,pumped storage power stations in Guangxi will also enter the stage of large-scale development and construction.Based on the research and analysis of the physical index of land acquisition and the compensation cost of land acquisition and resettlement for the construction of 10 pumped storage power stations that have been built or under construction or proposed in Guangxi,the author summarizes the main characteristics of the physical index of land acquisition and the compensation cost of land acquisition and resettlement for the construction of pumped storage power stations in Guangxi,and provides reference for the development and construction of other similar projects in the region in the future.
关 键 词:建设征地 实物指标 补偿费用 抽水蓄能电站 广西
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.132.143