检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵文博 ZHAO Wenbo(Datang Yantan Hydropower Co.,Ltd.,Dahua 530811,China)
机构地区:[1]大唐岩滩水力发电有限责任公司,广西南宁530004
出 处:《红水河》2024年第5期150-155,共6页
摘 要:针对岩滩水电站4号机组轴线超标的问题,笔者结合轴线结构特点,分析问题原因,提出轴线超标处理方法及处理过程,并阐述轴线调整实施情况。结果表明,处理后机组摆度达到标准允许值要求,消除了岩滩水电站4号机组轴线超标这一重大隐患,可为后续机组同类型问题处理提供参考。In view of the problem of the axis exceeding the standard for Unit 4 in Yantan Hydropower Station,the author analyzes the causes of the problem in combination with the characteristics of the axis structure,puts forward the treatment method and process of the axis exceeding the standard,and expounds the implementation of the axis adjustment.The results show that the swing of the unit after treatment meets the requirements of the standard allowable value,which eliminates the major hidden danger of the axis exceeding the standard for Unit 4 in Yantan Hydropower Station,and can provide reference for the subsequent handling of similar problems in the unit.
分 类 号:TV734[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.149.79