检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张长迪 梅赟 刘志伟 马泽琛 修瑞雪 Zhang Chang-di;Mei Yun;Liu Zhi-wei;Ma Ze-chen;Xiu Rui-xue
机构地区:[1]中建二局第三建筑工程有限公司,北京100070
出 处:《建筑技术开发》2024年第11期73-75,共3页Building Technology Development
摘 要:研究利用Phase 2数值模拟软件,对该项目深基坑工程建立二维几何模型,对其施工开挖过程进行模拟。经过对模拟计算结果的分析,从而分析出基坑稳定性,同时对开挖过程中土体最大位移和稳定性的变化情况进行分析,并对土体最大位移和稳定性进行总结,最后利用Phase 2数值模拟软件进行支护设计分析。Research on the use of Phase2 numerical simulation software to establish a two-dimensional geometric model of the deep excavation project and simulate its construction and excavation process.After analyzing the simulation results,the stability of the foundation pit was determined.At the same time,the changes in the maximum displacement and stability of the soil during excavation were analyzed,and the maximum displacement and stability of the soil were summarized..Finally,the Phase2 numerical simulation software was used for support design analysis.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7