检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李贝娜 高金坤 武长迪 王文婷 赵晨阳 LI Bei-na;GAO Jin-kun;WU Chang-di;WANG Wen-ting;ZHAO Chen-yang(BCEG No.3 Construction Engineering Co.,Ltd.,100044,Beijing,China)
机构地区:[1]北京市第三建筑工程有限公司,北京100044
出 处:《建筑技术》2024年第21期2642-2645,共4页Architecture Technology
摘 要:近年来在国家“双碳”政策的推动下,光伏建筑一体化技术的应用越来越普遍。北京工人体育场作为高标准建设大型专业体育场,基于低碳节能需求,应用了一种新型的光伏建筑一体化导风翼幕墙,将多种太阳能电池单元组合成光伏组件,在屋顶钢结构处设置导风翼与光伏结合,实现光伏发电与建筑装饰相融合。该新型导风翼幕墙结构若采用传统安装方法,存在施工效率低、施工安全性差、可调节性差等问题,通过工程实践与研究,研发了一种光伏建筑一体化导风翼幕墙施工技术,解决了传统安装方式的弊端,提升了施工效率,安装精度高且可调节性好,具有较好的经济效益及推广价值。In recent years,the application of photovoltaic building integration technology has become more and more common under the promotion of the national double carbon policy.Beijing Workers Stadium as a high standard construction of large-scale professional stadium,based on the demand for low-carbon energy saving,the application of a new type of photovoltaic building integration of wind guide wing curtain wall,a variety of solar cell units into photovoltaic modules,set up in the roof of the steel structure of the wind guide wing and photovoltaic combined to achieve photovoltaic power generation and building decoration integration.The new wind guide wing curtain wall structure,if the traditional installation method,there are problems such as low construction efficiency,poor construction safety,poor adjustability,etc.Through engineering practice and research,a photovoltaic building integrated wind guide wing curtain wall construction technology has been developed,which solves the drawbacks of the traditional installation method,improves the construction efficiency,has a high degree of installation precision and good adjustability,and has good economic benefits and popularization value.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.128.153.112