江卡渠首主要建筑物加固设计研究及优化方案分析  

Reinforcement Design and Optimization Plan Analysis for the Main Structures of the Jiangka Canal Head

在线阅读下载全文

作  者:吴波 WU Bo(Jiangxi Ganyu Construction Co.,Ltd.,Nanchang 330200,China)

机构地区:[1]江西赣禹工程建设有限公司,江西南昌330200

出  处:《中国水能及电气化》2024年第10期60-65,共6页China Water Power & Electrification

摘  要:为了保证新疆地区农业水利工程的正常运转,研究对江卡渠首工程主要建筑物的除险加固展开了规划设计,并应用模糊层析分析法和投影寻踪法构建了除险加固方法的比选模型。实验结果表明,该方法的评估结果较为适中,可实现评价维度的深层次分析,评价吻合度最高值可达94.16%,线性相关系数最大为98.17%。该方法完成了下部闸室和下游消能设施的加固方案比选,可合理选择适应性更高的方案。研究通过科学地分析与评价,有助于加固方案的选择。In order to ensure the normal operation of agricultural water conservancy projects in the Xinjiang region,a design plan for the risk mitigation and reinforcement of the main structures of the Jiangka Canal Head has been developed.The fuzzy analytic hierarchy process(FAHP)and projection pursuit method(PPM)are applied to construct a comparison model for the risk mitigation and reinforcement methods.Experimental results show that the evaluation results of this method are relatively moderate,enabling deep-level analysis of evaluation dimensions,with a maximum evaluation conformity rate of 94.16%and a maximum linear correlation coefficient of 98.17%.This method successfully completed the comparison of reinforcement plans for the lower gate chamber and downstream energy dissipation facilities,allowing for a reasonable selection of a more adaptive solution.Through scientific analysis and evaluation,this research contributes to the selection of reinforcement plans.

关 键 词:水利工程 渠首 除险 加固 水土保持 

分 类 号:TV222[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象