变换单元高温冷凝液系统运行问题的分析与解决  

Analysis and solution of operation problems of high-temperature condensate system in shift conversion unit

在线阅读下载全文

作  者:刘长乐 何敬祥 Liu Changle;He Jingxiang(CNOOC Huahe Coal Chemical Co.,Ltd.,Hegang Heilongjiang 154100,China)

机构地区:[1]中海石油华鹤煤化有限公司,黑龙江鹤岗154100

出  处:《煤化工》2024年第5期69-71,84,共4页Coal Chemical Industry

摘  要:针对中海石油华鹤煤化有限公司合成氨装置变换单元出现的高温冷凝液闪蒸槽压力低、高温冷凝液泵高频率运行、闪蒸气不能完全并入冷凝液汽提塔等问题,进行了原因分析,并结合运行情况,通过工艺操作调整和采取引高压氮气给闪蒸槽提压、优化冷凝液和闪蒸气管线伴热、直接向闪蒸气管线喷入低压蒸汽等技术改造措施,解决了高温冷凝液系统出现的问题。改造后,既节能降耗,又缩减了运行成本,降低装置运行风险。Cause analysis was made on the problems in the shift conversion unit of the synthetic ammonia plant of CNOOC Huahe Coal Chemical Co.,Ltd.,such as low pressure of high-temperature condensate flash tank,high-frequency operation of high-temperature condensate pump,and boil off gas unable to be completely incorporated into the condensate stripping tower.Combined with the operation situation,through process operation adjustment and technical renovation measures such as introducing high-pressure nitrogen to increase the pressure of the flash tank,optimizing the heat tracing of condensate and boil off gas pipelines,and directly injecting low-pressure steam into the boil off gas pipeline,the problems in the high-temperature condensate system were solved.After the renovation,it not only saved energy and reduced consumption,but also reduced operating costs and operation risk of the unit.

关 键 词:变换单元 高温冷凝液系统 冷凝液闪蒸槽 高温冷凝液泵 闪蒸气 

分 类 号:TQ546.4[化学工程—煤化学工程] TQ113.26

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象