检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邵林[1] SHAO Lin(Jiangdu Water Conservancy Project Management Office of Jiangsu Province,Yangzhou 225200,China)
机构地区:[1]江苏省江都水利工程管理处,江苏扬州225200
出 处:《江苏水利》2024年第11期48-51,61,共5页Jiangsu Water Resources
摘 要:以邵仙套闸智能运管系统为例,介绍通过系统建设推进工程运行管理数字化转型情况,分析其应用成效与特色。该系统开发应用提高了船舶通行效率,是江都水利枢纽数据赋能管理服务工作的成功案例,也是履行行业职责提升便民服务水平的生动实践,支撑“不上岸、不见面”新运行模式,科技助力打造更加顺畅、安全、便捷的“水上高速路”。Taking the Shaoxian Lock intelligent operation and management system as an example,this paper introduces the promotion of digital transformation of project operation management through system construction,and analyzes its application effectiveness and characteristics.The development and application of this system have improved the efficiency of ship passage,which is a successful case of data empowerment management services at Jiangdu Water Conservancy Hub.It is also a vivid practice of fulfilling industry responsibilities and improving the level of convenient services.It supports the new operation mode of“no landing,no meeting”,and technology helps to create a smoother,safer,and more convenient“water expressway”.
分 类 号:TV663[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.157.68