检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵跃 ZHAO Yue
机构地区:[1]国家电投集团黑龙江电力有限公司,黑龙江哈尔滨150028
出 处:《电力系统装备》2024年第10期107-109,共3页Electric Power System Equipment
摘 要:为研究风电出力不确定性对源储网联合规划的影响,以东北地区某省某新能源基地风电输出为例,分析了风电特性对源储网规划的影响,并使用DCGAN和K–means进行了风电场景生成和缩减优化,描述了风力发电的不确定性。研究结果表明,文章所提生成场景预测精度、可靠性优良,可准确评价源储网联合规划中风力发电的不确定性影响。To study the impact of wind power output uncertainty on joint planning of source storage network,taking the wind power output of a new energy base in a province in Northeast China as an example,the influence of wind power characteristics on source storage network planning was analyzed.DCGAN and K﹣means were used for wind power scenario generation and reduction optimization,and the uncertainty of wind power generation was described.The research results indicate that the generated scenario prediction accuracy and reliability proposed in the article are excellent,and can accurately evaluate the uncertainty impact of wind power generation in the joint planning of source storage network.
关 键 词:源储网联合规划 风电出力 不确定性分析 影响分析
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49