作  者:张明 李雪[1] 陈霖 鲍金峰 潘俊言 贾少东 ZHANG Ming;LI Xue;CHEN Lin;BAO Jinfeng;PAN Junyan;JIA Shaodong(School of Geoscience and Technology,Southwest Petroleum University,Chengdu 610500,China;Sichuan Yaxi Expressway Co.,Ltd.,Yaan 610041,China;Nanning Rail Transit Group Co.,Ltd.,Nanning 530000,China)

机构地区:[1]西南石油大学地球科学与技术学院,四川成都610500 [2]四川雅西高速公路有限责任公司,四川雅安625000 [3]南宁轨道交通集团有限责任公司,广西南宁530029

出  处:《国防交通工程与技术》2024年第6期67-71,81,共6页Traffic Engineering and Technology for National Defence

基  金:国家自然科学基金(51808469);四川省自然科学基金(2022NSFSC0442)。

摘  要:新建隧道近距离下穿既有地铁线路,易导致既有地铁线路发生较大沉降,影响列车行车安全。为确保施工安全性,减少对既有地铁线路的影响,分别建立三种加固方案的有限元模型,对比分析不同辅助加固方案控制既有线沉降的效果。结果表明:(1)加固新建隧道与既有线之间的夹层土可有效控制变形,尤其适用于砂卵石地层,可通过注浆填充空隙,提高土体密实度和强度,控制土体沉降。(2)注浆隔断方案对控制暗挖隧道拱顶沉降和净空收敛效果不佳,隧道与车站连接处差异沉降超过安全标准;注浆+管棚联合加固方案优于单一管棚加固。经过对比选用注浆+管棚联合加固方案以更好保证隧道施工过程的安全。The construction of a new tunnel in close proximity beneath an existing subway line is prone to inducing significant settlement in the latter,potentially jeopardizing train operation safety.To ensure construction safety and minimize the impact on the existing subway line,this study establishes finite element models for three reinforcement schemes,comparing the effectiveness of different auxiliary reinforcement methods in controlling settlement of the existing line.The results indicate that:①Reinforcing the interlayer soil between the new tunnel and the existing line effectively controls deformation,particularly in sandy pebble strata.This is achieved by grouting to fill voids,enhancing soil density and strength,and reducing soil settlement.②The grouting cutoff method proves ineffective in controlling vault settlement and clearance convergence in the tunnel,with differential settlement at the tunnel-station interface exceeding safety standards.The combined reinforcement approach of grouting and pipe roof outperforms single pipe roof reinforcement.Based on the comparison,the combined reinforcement scheme of grouting and pipe roof was selected to ensure safety during tunnel construction.

关 键 词:暗挖隧道 既有隧道 变形控制 加固方案 数值模拟 

分 类 号:U231[交通运输工程—道路与铁道工程] U455.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象