基于GIM的输电线路三维状态监测平台的建设  

Development of GIM-based 3D Condition Monitoring Platform for Transmission Lines

在线阅读下载全文

作  者:余容 张辉 王迪 程秋淼 YU Rong;ZHANG Hui;WANG Di;CHENG Qiumiao(PowerChina Guizhou Electric Power Engineering Co.,Ltd.,Guiyang 550000,China)

机构地区:[1]中国电建集团贵州电力设计研究院有限公司,贵州贵阳550000

出  处:《电工技术》2024年第19期94-96,共3页Electric Engineering

摘  要:介绍了一种基于GIM的输电线路三维状态监测平台。该平台通过激光点云数据构建线路GIM模型,结合线路通道倾斜摄影影像,建立输电线路三维场景,并利用GIM Engine平台实现GIM数据的自主解析和轻量、高效加载。平台包括用户权限管理、线路管理、设备管理、三维状态展示、覆冰反算、杆塔形变监测六大模块,实现了输电线路运行状态的三维可视化实时展示。The present work developed a transmission lines 3D condition monitoring platform based on GIM.The platform constructed the GIM model of the transmission line using the laser point cloud data,which was then combined with the tilt photography image of the line channel to establish 3D scene of the transmission line.It achieved independent analysis and lightweight and efficient loading of GIM data via the GIM Engine.The platform mainly included six modules:user rights management,line management,equipment management,three-dimensional state display,ice back calculation,tower deformation monitoring,and realized 3D visualized and real-time display of transmission lines operating conditions.

关 键 词:GIM Engine 三维拟合 线路感知 杆塔监测 

分 类 号:TM621.5[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象