道达尔感应加热弯管制造标准与其他标准的对比研究  

Comparative Study of TotalEnergies Manufacturing Standard for Induction Bend with Other Relavant Standards

在线阅读下载全文

作  者:黎郑坤 陈丽华 梅京卫 LI Zhengkun;CHEN Lihua;MEI Jingwei(Julong Steel Pipe Co.,Ltd.(JLSP),Qingxian 062658,China;Huagang Gas Group Co.,Ltd.,Renqiu 062552,China)

机构地区:[1]巨龙钢管有限公司,河北青县062658 [2]华港燃气集团有限公司,河北任丘062552

出  处:《钢管》2024年第5期82-86,共5页Steel Pipe

摘  要:通过对比道达尔能源公司UG-TIL-43-SIN1-720008感应加热弯管技术规范和ISO 15590-1以及国内弯管相关标准DEC要求,分析了这些标准的差异和难点。结果表明:道达尔能源公司弯管技术规范比国内和国际标准化组织ISO的弯管标准要求更加严格。道达尔感应加热弯管制造标准是在ISO 15590-1的基础上修改而成,增加了对母管入厂检验、制造工艺、尺寸检验和理化试验的详细要求。The TotalEnergies UG-TIL-43-SIN1-720008———Induction Heating Bend Pipe Technical Specification is compared with ISO 15590-1,and relevant domestic bend standards to analyze the differences and difficulties between and among them.The analysis result shows that the TotalEnergies bend specification is more stringent than both relevant domestic specifications and the ISO specifications.The former is made based on ISO 15590-1,but includes additional detailed requirements for incoming mother pipe acceptance inspection,manufacturing processes,dimensional inspection,and physical and chemical testing.

关 键 词:弯管 感应加热 道达尔 标准 对比 

分 类 号:TE973[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象