检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:鲁伟 马立亚 张蕴倩 刘少华 郭达 LU Wei;MA Liya;ZHANG Yunqian;LIU Shaohua;GUO Da(Shenzhen Raw Water Co.,Ltd.,Shenzhen 518003,China;Changjiang Survey,Planning,Design and Research Co.,Ltd.,Wuhan 430010,China)
机构地区:[1]深圳市原水有限公司,广东深圳518003 [2]长江勘测规划设计研究有限责任公司,湖北武汉430010
出 处:《水利水电快报》2024年第11期106-111,共6页Express Water Resources & Hydropower Information
基 金:国家重点研发计划项目“水工程协同联合水资源调度技术”(2021YFC3200303);深圳市供水系统调度模拟专题研究项目;长江勘测规划设计研究有限责任公司自主创新项目(CX2023S034);环鄱阳湖水资源配置工程方案研究(CX2021Z10-2)。
摘 要:随着珠三角水资源配置工程建设运行,深圳市原有以东江为主自东向西的供水系统将逐步转变为东西江联合供水的复杂环路网络,供水格局发生变化。为满足深圳市多水源复杂供水网络精准调度需求,同时为全市供水调度信息管理提供直观的操作展示平台,提升精细化供水调度能力,开发了深圳市供水调度模拟系统。系统建设含综合管理、水厂需水预测、境外水源需求、正常供水调度、检修供水调度、应急供水调度、调度模拟工具、用户信息管理八大功能模块,可支撑境外供水工程—水源水库—输水工程—水厂全过程多场景供水调度模拟。系统的开发可为深圳市供水调度方案及计划制定、供水调度信息管理提供有力支撑,对提高城市多水源复杂供水网络调度模拟的整体水平具有参考意义。With the construction and operation of the Pearl River Delta Water Resources Allocation Project,the original water supply system in Shenzhen,which was mainly composed of the East River and runs from east to west,would gradually transform into a complex loop network of combined water supply from the East and West Rivers,and the water supply pattern would change.In order to meet the precise scheduling needs of Shenzhen′s complex water supply network with multiple water sources,and to provide an intuitive operation display platform for the management of water supply scheduling information of the city,and to enhance the ability of water supply scheduling,a Shenzhen water supply scheduling simulation system was developed.The system contained eight functional modules including comprehensive scheduling management,water demand prediction,water diversion demand,normal water supply scheduling,maintenance period water supply scheduling,emergency water supply scheduling,scheduling simulation tools,and user information management.The system can support whole process and multi-scenario water supply scheduling simulation of water diversion project-water source reservoir-water conveyance project-water plant.The development of the system can provide a support for the formulation of water supply scheduling plans and information management in Shenzhen,and had an promoting and reference significance for improving the overall level of simulation of complex water supply networks with multiple water sources in the city.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.238.221