检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶永平 YE Yongping(China Railway 24th Bureau Group Fujian Railway Construction Co.Ltd.,Fuzhou 350013)
机构地区:[1]中铁二十四局集团福建铁路建设有限公司,福建福州350013
出 处:《福建建筑》2024年第10期77-81,共5页Fujian Architecture & Construction
摘 要:以福州某分离式双线矿山法隧道施工为背景,利用数值模拟建立隧道下穿建筑物模型,研究施工过程中地表沉降特征,及隧道以不同角度穿越建筑物施工后建筑物的扭曲变形。研究结果表明:在监测断面处地,表沉降有较大增幅;建筑物影响范围内的地表沉降值,比无建筑物时相同隧道埋深工况下的地表沉降值大而陡;建筑物与隧道开挖轴线夹角为30°时的最大地表沉降值,明显大于其它角度的沉降值;建筑物与隧道开挖轴线夹角越大,建筑物扭曲变形越大,对建筑物造成破坏也越大。Taking the construction of a separated double-line mine tunnel in Fuzhou as the background,a tunnel underpass building model is established by numerical simulation to study the surface settlement characteristics during construction and the distortion of the building after the tunnel passes through the building at different angles.The results show that the surface settlement increases greatly at the monitoring section;The surface settlement value in the influence area of the building is larger and steeper than that under the same tunnel depth condition without the building.When the Angle between the building and the tunnel excavation axis is 30°,the maximum surface settlement value is obviously larger than that at other angles.The greater the Angle between the building and the tunnel excavation axis,the greater the distortion of the building and the greater the damage to the building.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90