检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李舒仪 戴洪军 陈琳 LI Shuyi;DAI Hongjun;CHEN Lin(China Energy Engineering Group Jiangsu Power Design Institute Co.,Ltd.,Nanjing 211000,China)
机构地区:[1]中国能源建设集团江苏省电力设计院有限公司,江苏南京211000
出 处:《电力勘测设计》2024年第11期12-15,共4页Electric Power Survey & Design
摘 要:光热项目已不再享受财政补贴,但源网荷储项目开发成本仍处于较高水平,项目整体经济性成为制约立项的重要因素。本文以西北地区某大型风光基地“光热+光伏”一体化项目为例,提出改进项目收益的三个优化方案,采用“有无对比”的方法,计算各方案增量净现值率,选择最优方案。The concentrated solar power project no longer enjoys financial subsidies,and the development cost of the source network storage project is still at a high level,the overall economy of the project has become an important factor restricting the establishment of the project.Taking a large-scale scenery base in northwest China as an example,the paper puts forward three optimization schemes to improve the project income,and uses the method of"with or without comparison"to calculate the incremental net present value rate of each scheme and choose the best scheme.
分 类 号:TM615[电气工程—电力系统及自动化] TM-9
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7