检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王静 牛磊 潘虎 刘玉东 WANG Jing;NIU Lei;PAN Hu;LIU Yudong(Shanghai ChangKai Geotechnical Engineering Co.,Ltd,Shanghai 200093,China)
出 处:《天津建设科技》2024年第5期60-63,共4页Tianjin Construction Science and Technology
摘 要:为了研究济南地区粉质黏土层竖向渗透系数,以济南轨道交通3号线某基坑降水工程为例,通过际降水试验运行参数反演模拟地层渗透性参数,得出开挖范围内的主要土层粉质黏土层的渗透性参数,根据模拟反演计算得出,该区域的粉质黏土层的渗透性远大于勘察报告提供的参数。In order to study the vertical permeability coefficient of the powdery clay layer in Jinan area,this paper relies on a foundation pit dewatering project of Jinan Rail Transit Line 3,uses precipitation test operation parameters to invert and simulate the permeability parameters of the geological strata,and obtains the permeability param⁃eters of the main soil layer,the silty clay layer,within the excavation range.According to the simulation inver⁃sion calculation,the permeability of the silty clay layer in this area is much higher than the parameters provid⁃ed in the survey report.
分 类 号:U231.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.162.188