检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杜国正 卢庆亮 许京伟 杜寄勇 贾研 邓小杰 Du Guozheng;Lu Qingliang;Xu Jingwei;Du Jiyong;Jia Yan;Deng Xiaojie(Jinan Heavy Industry Co.,Ltd.Intelligent Tunneling Technology Equipment and Research Institute ShandongJi’nan 250109;Jinan Rail Transit Group Construction Investment Co.,Ltd.ShandongJi’nan 250000)
机构地区:[1]济南重工股份有限公司智能掘进技术装备与研究院,山东济南250109 [2]济南轨道交通集团建设投资有限公司,山东济南250000
出 处:《科技风》2024年第32期90-93,共4页
基 金:泰山产业领军人才工程专项经费资助。
摘 要:针对盾构机中常用的高强度紧固螺栓预紧力展开相关研究,介绍了螺纹紧固件扭紧力矩与预紧力之间的关系,以及螺纹紧固件的常用预紧力控制方法,并针对盾构机刀盘喷口的螺纹紧固进行了有限元仿真分析,得出了螺栓预紧力不足对螺栓工作载荷的影响。The preload of high-strength fastening bolts commonly used in rectangular shield machine was studied,The relationship between the tightening torque and preload of threaded fasteners was introduced,as well as the common preload control method of threaded fasteners.The finite element simulation analysis was carried out for the bolt fastening of the cutter head nozzle of rectangular shield machine,and the influence of insufficient preload of bolt on the working load of bolt was obtained.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170