检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:翁锦瑞 WENG Jinrui(Fujian Industrial Equipment Installation Co.,Ltd.,Fuzhou,Fujian Province,350001 China)
机构地区:[1]福建省工业设备安装有限公司,福建福州350001
出 处:《科技资讯》2024年第20期173-175,共3页Science & Technology Information
摘 要:以清远市绿能环保发电项目为例,对其工业厂房建筑给排水施工进行了分析,目的是评估该项目的给排水施工情况,探讨其方法的合理性。采用实地调研和文献分析的方法,对该项目的给排水施工进行调查和分析,发现其施工方案相对合理,能够满足工厂的生产和环境保护需求。This article takes the Green Energy and Environmental Protection Power Generation Project in Qin⁃gyuan as an example to analyze water supply and drainage construction in its industrial factory buildings.The pur⁃pose is to evaluate the water supply and drainage construction situation of the project,explore the rationality of its methods.Through methods of Field Research and Literature Analysis to investigate and analyze the water supply and drainage construction of the project.It is found that the construction plan is relatively reasonable and can meet the production and environmental protection needs of the factory.It is recommended to further strengthen con⁃struction management and improve construction quality and efficiency in similar projects.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195