作 者:胡长浩[1] 刘璐瑶 夏帆 华有明 HU Changhao;LIU Luyao;XIA Fan;HUA Youming(Xiluodu Hydropower Plant,China Yangtze Power Co.,Ltd.,Zhaotong 657300,China)
机构地区:[1]中国长江电力股份有限公司溪洛渡水力发电厂,云南昭通657300
出 处:《水电与新能源》2024年第11期6-8,11,共4页Hydropower and New Energy
摘 要:某水电站大型出线竖井井圈混凝土渗水,导致GIL接地铜排锈蚀。通过对出线竖井渗水规律的分析,在不影响出线竖井设备正常运行的前提下,采取系统布设排水管、定点钻孔引排、裂缝和施工缝化学灌浆补强处理等措施,实现了施工干扰小、出线竖井新增渗水点大为减少的效果。Leakage is observed in the shaft ring concrete of the large-scale outgoing line shaft in a hydropower station,which causes corrosion of the GIL grounding copper bars.With the analysis of the leakage characteristics of the outgoing line shaft,treatment measures such as systematic arrangement of drainage pipes,fixed-point drilling and drainage,and chemical grouting reinforcement of cracks and construction joints are adopted without affecting the normal operation of the shaft equipment.With minimal construction interference,the number of new leakage points in the shaft is greatly reduced.
分 类 号:TV698[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30