作 者:刘琦 鲁瑶 刘大斌 李长泉[1] LIU Qi;LU Yao;LIU Dabin;LI Changquan(Xiluodu Hydropower Plant,China Yangtze Power Co.,Ltd.,Zhaotong 657300,China)
机构地区:[1]中国长江电力股份有限公司溪洛渡水力发电厂,云南昭通657300
出 处:《水电与新能源》2024年第11期12-14,共3页Hydropower and New Energy
摘 要:大型水电站压力管道排水量大,仅依靠压力管道的排水装置进行排水,不能满足快速排水的需求。在分析三种机组排水方式特点基础上,提出了自动开导叶排水基本条件和关键过程,根据机组转速、导叶开度以及关键节点的时间等参数控制排水流程,从而实现压力钢管快速排水。The drainage volume of the penstock in large-scale hydropower stations is usually large.Relying solely on the drainage device of the penstock,the rapid drainage requirement cannot be met.Based on the analysis of the characteristics of three drainage methods of the units,the basic conditions and key processes of the automatic guide vane opening drainage are determined.Thus,the drainage process can be controlled according to parameters such as the unit speed,guide vane opening,and key point time,thereby achieving the rapid drainage of the penstock.
分 类 号:TV734[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.91