检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:包唐伟 孟春琦 张兆礼 刘文忠[1] 樊小波[1] 杨泞源 BAO Tangwei;MENG Chunqi;ZHANG Zhaoli;LIU Wenzhong;FAN Xiaobo;YANG Niyuan(Xiluodu Hydropower Plant,China Yangtze Power Co.,Ltd.,Zhaotong 657300,China)
机构地区:[1]中国长江电力股份有限公司溪洛渡水力发电厂,云南昭通657300
出 处:《水电与新能源》2024年第11期32-34,共3页Hydropower and New Energy
摘 要:针对极端恶劣环境中闸门锁定梁无法自动投入和退出的问题,研制了一套以闸门自身上下运行作为动力源的耦合式自动投退锁定梁装置,该装置由动力源触发器、装置移梁机构和安全控制系统共3部分组成,其中装置移梁机构接收触发器传递来的动力,然后按需传递给锁定梁,从而实现闸门在启闭过程中锁定梁自动投退功能。该装置可极大降低人员操作风险与劳动强度。Due to the harsh working conditions,the locking beam of the sluice gates in hydropower stations is often unable to automatically engage into operation or disengage from service.Thus,a gate coupled automatic engagement and disengagement locking beam device is developed,which is powered by the up and down movement of the gate.The device consists of three parts:a power trigger,a device moving mechanism,and a safety control system.The device moving mechanism receives the power transmitted from the trigger,and transmit it to the locking beam as needed,thereby realizing the automatic engagement and disengagement of the locking beam during the operation of the gate.The device can significantly reduce the operation risks and labor intensity of the operation personnel.
分 类 号:TV663[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.189.13.48