钢-混组合连续梁桥无支架施工技术  

Study on Construction Technology of Steel Reinforce Concrete Continuous Beam Bridge Without Support

在线阅读下载全文

作  者:付斌 FU Bin(The Second Engineering Co.Ltd.of China Railway Seventh Group,Shenyang 110000,China)

机构地区:[1]中铁七局集团第二工程有限公司,沈阳110000

出  处:《工程建设与设计》2024年第21期157-159,共3页Construction & Design for Engineering

摘  要:针对大跨度钢-混组合梁桥面板及翼缘板为现浇结构的组合梁桥,存在浇筑支架搭拆复杂且难度大的施工问题。论文提出了一种预应力钢-混组合箱梁悬拼施工装置,采用精轧螺纹钢锚固装置作为锚固措施,对开口钢箱梁进行悬臂拼装施工,给出了无支架施工技术方案与施工步骤。For the composite beam bridge with large span steel reinforce concrete composite beam bridge whose panel and flange plate are cast-in-place structure,there is a complicated and difficult construction problem.In this paper,a suspension construction device of prestressed steel-concrete composite box girder is proposed.The cantilever construction of open steel box girder is carried out by adopting fine rolled rebar anchoring device as anchoring measure.The technical scheme and procedure of construction without support are given.

关 键 词:钢-混组合梁桥 连续梁 预应力 悬拼施工 无支架施工 

分 类 号:U445.464[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象