实验室工程施工过程控制重点分析  

Key Analysis of Laboratory Engineering Construction Process Control

在线阅读下载全文

作  者:王威 WANG Wei(Sinosteel ZhengzhouResearch Institute ofSteel Wire Products Co.Ltd.,Zhengzhou 450001,China)

机构地区:[1]中钢集团郑州金属制品研究院股份有限公司,郑州450001

出  处:《工程建设与设计》2024年第21期251-253,共3页Construction & Design for Engineering

摘  要:施工过程控制和调试验收是实验室工程施工阶段的控制重点,开工前应做好各专业工程施工界面划分和施工工序规划。在实验室各专业工程中,通风空调工程会直接影响实验室使用功能的实现和运行安全,因此,施工阶段应格外重视通风空调工程的施工质量和系统调试工作。Construction process control and commissioning acceptance are the key points of control during the construction phase of laboratory engineering.Before starting work,the division of construction interfaces and construction process planning for each professional engineering should be done well.In various professional engineering projects in the laboratory,ventilation and air conditioning engineering directly affects the realization of laboratory functions and operational safety.Therefore,special attention should be paid to the construction quality and system debugging work of ventilation and air conditioning engineering during the construction phase.

关 键 词:实验室施工 施工过程控制 系统调试 

分 类 号:TU71[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象