检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐伟杰 綦洪帅 卢阳 TANG Weijie;QI Hongshuai;LU Yang(Shanghai Zhonghan Dooch Pump MFG Co.,Ltd.,Shanghai 201716,China;Shanghai Dujuan Engineering Design and Consulting Co.,Ltd.,Shanghai 201899,China)
机构地区:[1]上海中韩杜科泵业制造有限公司,上海201716 [2]上海杜鹃工程设计与顾问有限公司,上海201899
出 处:《净水技术》2024年第S02期71-75,共5页Water Purification Technology
摘 要:我国南方众多省市,受限于多山的地理环境特征,以及村庄和居民分布散落的特点,市政水厂管网无法做到延伸供给,故只能采取建设分布式供水站的方式,以满足单村供水需求。传统的单村供水站多以三池法,一体化砂滤罐设备等形式建设,但无论三池法,还是一体化砂滤罐设备,核心过滤方式仍然为传统砂过滤,过滤精度较差,对前端絮凝沉淀处理工艺要求严格,出水水质不稳定,并且需要专业的运维管理。而浸没式超滤膜工艺的滤料为超滤膜,过滤精度远高于传统砂滤,对前端絮凝沉淀工艺要求较低。在实际工程化运行中平行对比两种工艺处理出水,发现传统水厂处理工艺出水浑浊度在15 NTU左右,出水细菌总数在2000 CFU/mL左右,而超滤工艺出水浑浊度在0.1 NTU左右,出水细菌总数在15 CFU/mL左右,远优于传统处理工艺,并且超滤工艺自动化程度高,更易实现智能化、无人化管理。Many provinces and cities in the south,limited by the mountainous geography,and the scattered nature of vllages and inhabitants,the municipal water plant pipe network cannot be extended supply,therefore,only the construction of distributed water supply stations can be adopted,to meet the needs of a single village water supply.The traditional single-village water supply station mostly uses the three-pool method,integrated sand filter tank equipment and other forms of construction,but whether it is the threepool method,or the integrated sand filter tank equipment,the core filtration method is still traditional sand filtration,poor filtration accuracy,the requirements for the front-end flocculation and precipitation treatment process are strict,the quality of effluent is unstable,and professional operation and maintenance management is required.The filter material of the immersion ultrafiltration membrane process is an ultrafiltration membrane,the filtration accuracy is much higher than that of traditional sand filtration,the requirements for the front-end flocculation precipitation process are low.In actual engineering operation,parallel comparison is made between the two processes for treating effluent,it is found that the turbidity of the efluent from traditional water treatment processes is around 15 NTU,the total number of bacteria in effluent is about 2000 CFU/mL.The turbidity of the effluent from the ultrafiltration process is around O.1 NTU,and the total number of bacteria in effluent is around 15 CFU/mL,which is far superior to traditional treatment processes.Moreover,the ultrafiltration process has a high degree of automation,making it easier to achieve intelligent and unmanned management.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7