核能发电设备供货合同项目管理研究  

Research on Project Management of Nuclear Power Generation Equipment Supply Project

在线阅读下载全文

作  者:李昆 赵乐 包宜佳 LI Kun;ZHAO Le;BAO Yijia(Dongfang Electirc Machinery Co.,Ltd.,618000,Deyang Sichuan,China)

机构地区:[1]东方电气集团东方电机有限公司,四川德阳618000

出  处:《东方电气评论》2024年第6期47-50,共4页Dongfang Electric Review

摘  要:核电是国家大力发展的清洁能源之一。核能发电设备是核电站系统工程的重要组成部分,它的质量将会对核电站安全运行产生至关重要的影响。因此,研制单位要加强对核能发电设备供货合同项目管理的重视,协调相关方之间的关系,进而提高设备研制质量和产出效率,以保障核电站工程的顺利开展。本文主要研究如何提高核能发电设备供货合同项目管理工作水平。Nuclear power is the clean energy energetically by the state.Nuclear power generation equipment is an important part of nuclear power plant systems engineering,whose quality would have a crucial impact on the safe operation of nuclear power plant.Therefore,the research and manufacturing corporation should pay more attention to the project management of nuclear power generation equipment supply project,coordinate the relationship between the relevant parties,and then improve the equipment manufacturing quality and output efficiency,to ensure the smooth implementation of nuclear power plant construction.This paper mainly studies how to improve the project management work of nuclear power generation equipment supply project.

关 键 词:核能发电设备 项目管理 核电站 

分 类 号:TM623[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象