检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李海鹏 尹亚南 Li Haipeng;Yin Yanan(Chensilou Coal Mine,Henan Longyu Energy Co.,Ltd.,Yongcheng 476600,China)
机构地区:[1]河南龙宇能源股份有限公司陈四楼煤矿,河南永城476600
出 处:《煤炭与化工》2024年第11期91-93,共3页Coal and Chemical Industry
摘 要:为降低陈四楼煤矿主副井底被淹的风险,提出了井底水窝排水系统双回路供电改造、自动控制系统优化、排水设施合理配置的优化方案。通过现场应用双回路馈电开关,利用其自动切换功能,实现排水系统配电点双回路供电网络;运用浮球开关灵活设置潜水泵开启顺序,并贯通水窝,使两仓互为备用,实现异常情况下4台水泵联合排水功能。实践证明,井底水窝排水系统优化方案应用良好,保障了主副井提升系统安全稳定运行,具有借鉴和推广意义。In order to reduce the risk of flooding in the main and auxiliary shaft bottom of Chensilou Coal Mine,the optimization scheme of double circuit power supply transformation,automatic control system optimization and reasonable allocation of drainage facilities is put forward.Through the field application of double-circuit feed switch,using its automatic switching function,the double-circuit power supply network of the distribution point of the drainage system is realized.The floating ball switch is used to flexibly set the opening sequence of the submersible pump,and the water nest is connected to make the two warehouses standby to each other,so as to realize the joint drainage function of four pumps under abnormal conditions.Practice has proved that the optimization scheme of the bottom hole water nest drainage system is well applied,which ensures the safe and stable operation of the main and auxiliary shaft hoisting system,and has reference and promotion significance.
分 类 号:TD74[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.151.116