水资源配置工程输水隧洞渗漏分析及处理措施  

Analysis and Treatment Measures for Leakage of Water Conveyance Tunnel in Water Resource Allocation Project

在线阅读下载全文

作  者:刘浩阳 LIU Hao-yang(Guangdong Hydropower Planning&Design Institute Co.Ltd.,Guangzhou 510635,China)

机构地区:[1]广东省水利电力勘测设计研究院有限公司,广东广州510635

出  处:《海河水利》2024年第11期36-39,51,共5页Haihe Water Resources

摘  要:以珠江三角洲水资源配置工程为背景,对高新沙水库至沙溪高位水池段输水隧洞首次充水试验异常断面进行分析,并提出应对措施。监测项目数据分析结果显示,接缝、渗压及锚索锚固力等监测数据受内水压力影响明显,先随内水压力增大呈不利趋势变化,后随内水压力减小呈恢复趋势变化。经综合判断该隧洞在首次充排水试验期间有内水外渗情况发生,分析了隧洞渗漏可能造成的危害,并针对性提出缺陷处理措施,确保了隧洞运行的安全性和稳定性。Based on the Pearl River Delta water resources allocation project,the abnormal section of the first water filling test of the water conveyance tunnel from Gaoxinsha Reservoir to Shaxi High-level Pool was analyzed,and the corresponding measures were put forward.The analysis results of monitoring project data showed that the monitoring results of joints,seepage pressure and anchor cable anchorage force were obviously affected by the internal water pressure,which showed an unfavorable trend with the increase of the internal water pressure,and then showed a recovery trend with the decrease of the internal water pressure.According to the comprehensive judgment,there was seepage of internal water in the tunnel during the first filling and draining test.The possible hazards caused by leakage of the tunnel were analyzed,and the corresponding measures were proposed to ensure the safety and stability of tunnel operation.

关 键 词:水利水电工程 输水隧洞 充排水试验 内水外渗 处理措施 

分 类 号:TV672.2[水利工程—水利水电工程] TV698.233

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象