检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭俊辰 曹雅昌 郭胜男 GUO Jun-chen;CAO Ya-chang;GUO Sheng-nan(Haihe Tide Gate Reinforcement Project Construction Management Bureau,Tianjin 300061,China)
机构地区:[1]海河防潮闸除险加固工程建设管理局,天津300061
出 处:《海河水利》2024年第11期125-128,共4页Haihe Water Resources
摘 要:海河防潮闸除险加固工程位于国家基本水文站海河闸水文站10 km范围内,根据《水文观测环境和设施保护办法》,建设单位应当采取相应措施,在征得对水文测站有管理权限的流域管理机构或水行政主管部门同意后方可建设。分析了海河防潮闸除险加固工程对海河闸水文站观测影响情况,提出了合理可行的补救措施及建议,以减轻或消除对水文观测的影响。Haihe Tide Gate reinforcement project is located within 10 kilometers of Haihe Gate hydrology station,which belongs to the national basic hydrology station.According to the"hydrological monitoring environment and facility protection Measures",the construction unit should take corresponding measures.The station can be constructed only with the consent of the basin management authority or the water administration department that has administrative authority over the hydrological station.In this paper,the influence of Haihe Tide Gate reinforcement project on the monitoring of hydrology station of Haihe sluice is analyzed,and reasonable and feasible remedial measures and suggestions are put forward to reduce or eliminate the influence.
分 类 号:TV123[水利工程—水文学及水资源] P332[天文地球—水文科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49