检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张亚宾 黄琛泷 马姣阳 陈超 李胜辉[3] 陈丽媛[3] ZHANG Yabin;HUANG Chenlong;MA Jiaoyang;CHEN Chao;LI Shenghui;CHEN Liyuan(School of Mining Engineering,North China University of Science and Technology,Tangshan 063210,China;Mine Green Intelligent Mining Technology Innovation Center of Hebei Province,Tangshan 063210,China;Miaogou Iron Mine,Hebei Iron and Steel Group Mining Co.,Ltd.,Qinhuangdao 066501,China)
机构地区:[1]华北理工大学矿业工程学院,河北唐山063210 [2]河北省矿山绿色智能开采技术创新中心,河北唐山063210 [3]河北钢铁集团矿业有限公司庙沟铁矿,河北秦皇岛066501
出 处:《金属矿山》2024年第10期24-29,共6页Metal Mine
基 金:河钢集团重点科技项目(编号:HG2023130)。
摘 要:作为覆盖层的改性尾砂损耗程度对露天转地下矿山的安全起着重要作用。为此,依托庙沟铁矿露天转地下矿山回采条件,采用模型试验方法,研究了改性尾砂作为覆盖层在放矿过程中的运动规律与磨蚀性。实验结果表明:受侧面墙体限制的左右区域的改性尾砂颗粒,其整体运移要比中间区域的改性尾砂颗粒整体运移量大;在放矿过程中改性尾砂颗粒的质量损失与其运移距离成正比;根据区域初始总质量、放矿循环数与放矿后的区域质量拟合得到放矿循环数与放矿后改性尾砂颗粒整体质量的关系式,由此得到了改性尾砂颗粒磨蚀性在前三个循环放矿过程中不断降低,之后其磨蚀性相对稳定的结论。研究成果对覆盖层磨蚀导致的安全问题有一定的理论参考价值。The loss degree of modified tailings as overburden plays an important role in the safety of open-pit to underground mines.Therefore,based on the mining conditions of the open-pit to underground mine in Miaogou Iron Mine,the model test method was used to study the movement law and abrasiveness of the modified tailings as the overburden during the ore drawing process.The experimental results show that the overall migration of modified tailings particles in the left and right regions limited by the side wall is larger than that in the middle region;In the process of ore drawing,the mass loss of modified tailings particles is proportional to its migration distance.According to the initial total mass of the region,the number of oredrawing cycles and the regional mass after ore-drawing,the relationship between the number of ore-drawing cycles and the overall mass of the modified tailings particles after ore-drawing is obtained.It is concluded that the abrasiveness of the modified tailings particles decreases continuously in the first three cycles of ore drawing,and then its abrasiveness is relatively stable.The research results have certain theoretical reference value for the safety problems caused by overburden.
关 键 词:覆盖层 露天转地下 放矿 模型试验 改性尾砂 磨蚀性
分 类 号:TD853[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.227.183.215