作 者:崔文杰 周铭民 Cui Wenjie;Zhou Mingmin(The First Hydrogeological Team,China National Administration of Coal Geology,Handan 056000,China)
机构地区:[1]中国煤炭地质总局第一水文地质队,河北邯郸056000
出 处:《煤矿机械》2024年第12期138-140,共3页Coal Mine Machinery
摘 要:钻机整体平移是煤矿防治水地面区域治理注浆工程中重要的组成部分。在以往施工作业中,钻孔结束后钻机通常需要拆卸、运输到新的钻孔位置,然而对于相邻的钻孔来说,会造成时间和资源的浪费。因此采用钻机整体平移到新钻孔的方法,减少钻机拆装的频率,节省时间,减轻作业人员的劳动强度,降低成本支出,以便更快地实施下一次钻孔作业。The translation of the drilling rig is an important component of the grouting project for water prevention and control in coal mine.In previous construction operations,the drilling rig usually needs to be disassembled and transported to a new drill hole position after drilling is completed.However,for adjacent drill hole,it will waste time and resources.Therefore,the method of overall translation of the drilling rig to the new drill hole was adopted to reduce the frequency of disassembly and assembly of the drilling rig,save time,reduce the labor intensity of operators and reduce cost expenditures,so as to enable faster implementation of the next drilling operation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7