检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:廖成胜 陈洪刚 孙福建 宋泉训 亓智慧 Liao Cheng-sheng;Chen Hong-gang;Sun Fu-jian;Song Quan-xun;Qi Zhi-hui(Zibo Zichai New Energy Co.,Ltd.,Shandong Zibo 255000)
机构地区:[1]淄博淄柴新能源有限公司,山东淄博255000
出 处:《内燃机与配件》2024年第20期72-74,共3页Internal Combustion Engine & Parts
摘 要:新能源燃气电站指以煤矿瓦斯、工业尾气、生物质气、沼气等可燃气体燃料为原料,以内燃机为原动机的电力单元,燃气电站电气主接线设计对燃气电站的安全运行起着至关重要的作用。结合燃气电站建设的实际,从不同主接线方式的优缺点、技术特点、投资经济性方面,对新能源燃气电站主接线方式的方案设计与选择方法进行了概括和论述。New energy gas power station refers to the electric power unit with coal mine gas,industrial exhaust gas,biomass gas,biogas and other combustible gas fuels as raw materials and internal combustion engine as the prime mover,and the electrical main wiring design of the gas-fired power station plays a vital role in the safe operation of the gas-fired power station.Combined with the actual construction of gas-fired power stations,the scheme design and selection methods of the main wiring modes of new energy gas-fired power stations are summarized and discussed from the aspects of advantages and disadvantages,technical characteristics and investment economy of different main wiring modes.
分 类 号:TM624[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.91