水利工程施工阶段监理“四控”要点研究  

Research on the Key Point of"Four Controls"in Supervision at Water Conservancy Engineering Construction Stage

在线阅读下载全文

作  者:赵清春 ZHAO Qingchun(Guangdong Xijiang Construction&Development Co.,Ltd.,Zhaoqing 526040,Guangdong,China)

机构地区:[1]广东西江建设发展有限公司,广东肇庆526040

出  处:《工程技术研究》2024年第17期131-133,共3页Engineering and Technological Research

摘  要:为保证水利工程的建设质量,文章总结监理施工阶段“四控”流程和基本方式。以某水利工程为例,建立监理组织机构,从质量、进度、成本和安全四个方面着手,分析施工控制要点,并基于和商指数(H指数),评价监理“四控”效果,研究成果可为类似项目监理提供借鉴。In order to ensure the construction quality of water conservancy engineering,this paper summarizes the"four controls"process and basic methods in the supervision construction stage.Taking a water conservancy project as an example,the supervision organization is established,and the key points of construction control are analyzed from four aspects of quality,progress,cost and safety.Based on the H index,the"four controls"effect of supervision is evaluated.The research results can provide reference for similar project supervision.

关 键 词:水利工程 施工监理 进度控制 成本控制 安全控制 

分 类 号:TV51[水利工程—水利水电工程]

 