检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨鹏尊 YANG Pengzun(Guangdong Yuantian Engineering Co.,Ltd.,Guangzhou 510850,Guangdong,China)
机构地区:[1]广东省源天工程有限公司,广东广州510850
出 处:《工程技术研究》2024年第17期208-210,共3页Engineering and Technological Research
摘 要:文章以某地区水库二期工程为例,详细勘测水库围堰的地质情况,并结合工程实际情况,提出护坡结构设计和施工关键要点。结果表明,在围堰左岸地质为中等强透水性的情况下,主要透水层为强风化岩体层。针对这一特点,提出有效的防渗处理方法,以期为类似工程提供参考和借鉴。Taking the second phase engineering of a reservoir in a certain area as an example,this paper investigates the geological conditions of the reservoir cofferdam in detail,and puts forward the key points of slope protection structure design and construction in combination with the actual situation of the engineering.The results show that the main permeable layer is the strongly weathered rock mass layer when the geological condition on the left bank of the cofferdam is medium strong permeability.In view of this feature,effective anti-seepage treatment methods are proposed in order to provide reference for similar engineering.
分 类 号:TV698.235[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.93.197