检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:云涛 YUN Tao(Ningxia Water Resources&Hydropower Survey Design&Research Institute Co.,Ltd.,Yinchuan 750001,Ningxia,China)
机构地区:[1]宁夏水利水电勘测设计研究院有限公司,宁夏银川750001
出 处:《工程技术研究》2024年第17期211-213,共3页Engineering and Technological Research
摘 要:为防止土石坝出现渗流破坏,文章总结土石坝防渗技术选择的原则,分析水平防渗技术和垂直防渗技术在土石坝防渗中的应用要点。同时,以第四拦洪库提升改造工程的0+700~2+684段土石坝为研究对象,对比棱体排水、贴坡排水、水平褥垫排水等排水设施的设计方案,并选择贴坡排水用于坝体排水,研究成果可为土石坝防渗和排水提供借鉴。In order to prevent seepage failure of earthrock dam,this paper summarizes the principles of antiseepage technology selection of earth-rock dam,and analyzes the key application points of horizontal antiseepage technology and vertical anti-seepage technology in seepage prevention of earth-rock dam.At the same time,taking the 0+700-2+684 section earth-rock dam of the fourth flood detention reservoir upgrading engineering as the research object,the design schemes of drainage facilities such as prism drainage,slope drainage and horizontal blanket drainage are compared,and slope drainage is selected for dam drainage.The research results can provide reference for seepage prevention and drainage of earth-rock dams.
分 类 号:TV641[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.163.8