抽水蓄能电站竖井上弯段混凝土施工技术研究  

Research on Concrete Construction Technology of Shaft Upper Curved Section in Pumped Storage Power Station

在线阅读下载全文

作  者:韩飞[1] HAN Fei(Sinohydro Bureau 7 Co.,Ltd.,Chengdu 610213,Sichuan,China)

机构地区:[1]中国水利水电第七工程局有限公司,四川成都610213

出  处:《工程技术研究》2024年第18期88-90,共3页Engineering and Technological Research

摘  要:抽水蓄能电站竖井上弯段混凝土施工技术研究旨在探索高效、安全、可靠的混凝土施工新工艺。文章通过深入分析竖井上弯段的结构特点与施工难点,结合现场实际条件,提出了一系列优化措施,包括提高混凝土入仓质量、改进浇筑与振捣工艺、加强模板支撑与稳定性控制等。实际应用验证了文章采用的施工技术的可行性,提高了施工质量。The research on the concrete construction technology of the shaft upper curved section of the pumped storage power station aims to explore an efficient,safe and reliable new concrete construction process.Through in-depth analysis of the structural characteristics and construction difficulties of the upper curved section of the shaft,combined with the actual conditions on site,this paper puts forward a series of optimization measures,including improving the quality of concrete warehousing,improving the pouring and vibrating process,and strengthening the formwork support and stability control.The practical application verifies the feasibility of the construction technology adopted in the paper and improves the construction quality.

关 键 词:混凝土施工技术 竖井上弯段 抽水蓄能电站 混凝土入仓 

分 类 号:TV743[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象