作 者:杨铭 YANG Ming(Ningxia Xingdian Construction Progect Nanagement Co.,Ltd.,Yinchuan 750004,Ningxia,China)
机构地区:[1]宁夏兴电工程监理有限责任公司,宁夏银川750004
出 处:《工程技术研究》2024年第18期94-96,共3页Engineering and Technological Research
摘 要:虽然山地风力发电项目有利于充分利用环境优势开发风能新能源,但是山地风力发电项目风机基础施工往往存在山地地形复杂、生态环境保护需求大等难点。为丰富山地风力发电项目风机基础施工经验,文章选取某处山脊东侧开展的风力发电项目风机基础施工案例研究了其施工要点。从其施工过程汲取经验,指出了山地风力发电项目风机基础施工的注意事项,旨在为相似工程提供施工技术与方法借鉴。Although the mountainous wind power generation project is conducive to making full use of environmental advantages to develop new wind energy,the wind turbine foundation construction in mountainous wind power generation project often has difficulties such as complex mountainous terrain and large demand for ecological environment protection.In order to enrich the construction experience of wind turbine foundation in mountainous wind power generation project,this paper selects the wind turbine foundation construction case of wind power generation project carried out on the east side of a mountain ridge to study its key construction points.Drawing experience from its construction process,the precautions are pointed out in the construction of wind turbine foundation in mountainous wind power generation project,in order to provide reference for construction technology and method of similar engineering.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49