检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑效旭 邵志平 邢朝阳 朱红斌 童晓静 杨阳[1,2] 黄振华 张旭坡 吴俊辉 张亮 王靖霖 王东升 徐圣君[1,2] ZHENG Xiao-xu;SHAO Zhi-ping;XING Zhao-yang;ZHU Hong-bin;TONG Xiao-jing;YANG Yang;HUANG Zhen-hua;ZHANG Xu-po;WU Jun-hui;ZHANG Liang;WANG Jing-lin;WANG Dong-sheng;XU Sheng-jun(Research Center for Eco-Environmental Sciences,Chinese Academy of Sciences,Beijing 100085,China;Yangtze River Delta Research Center for Eco-Environmental Sciences
机构地区:[1]中国科学院生态环境研究中心,北京100085 [2]长三角<义乌>生态环境研究中心,浙江义乌322000 [3]浙江省义乌市水务局,浙江义乌322000 [4]金华市生态环境应急与监控中心,浙江金华321000
出 处:《中国给水排水》2024年第21期67-72,共6页China Water & Wastewater
基 金:国家自然科学基金资助重点项目(52030003)。
摘 要:义乌市某工业水厂出水水质较差,用水端反渗透膜堵塞频繁。基于此,提出了近期结合远期的改造运行方案,以延长膜堵塞周期。通过分析膜堵塞物的元素成分,发现有机物的主要元素C、O、N、P的占比分别为35.62%、32.64%、27.08%、0.76%,四种元素总占比高达96.10%,因此有机物是膜堵塞的主要原因。近期方案使用活性炭结合曝气生物滤池的联合工艺,总有机碳(TOC)去除率可达33.85%。远期方案增加预臭氧-活性炭-后臭氧(沉后)-活性炭工艺,TOC去除率可进一步提高至50%左右。该方案综合了近期与远期的运行策略,既满足了应急处理的需求,又达到了长期稳定运行的目标,可为实际工程中其他工业水厂出现类似现象提供技术经验。The effluent quality of an industrial water plant in Yiwu City is substandard,and the reverse osmosis membrane at the water end is clogged frequently.On this basis,the paper proposed a short-term combined with long-term operation plan to prolong the membrane fouling period.By analyzing the elemental composition of the membrane-fouling material,it was discovered that the main elements of organic matter,namely C,O,N,and P,accounted for 35.62%,32.64%,27.08%,and 0.76%respectively and the total proportion of these four elements was as high as 96.10%. Therefore, organic matter was theprimary cause of membrane fouling. In the short-term operation plan, the combined process of activatedcarbon and biological aerated filter was employed, and the removal efficiency of TOC reached 33.85%. Inthe long-term operation plan, the process of pre-ozonation-activated carbon-post-ozonation (postprecipitation)-activated carbon was incorporated, and the TOC removal efficiency could be furtherelevated to approximately 50%. This plan integrated the short-term and long-term operational strategies,not only fulfilling the requirements of emergency treatment but also attaining the objective of long-termstable operation, which could offer technical experience for other industrial water plants with similarphenomena in actual projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171