QC活动提高UHPC板一次安装合格率  

QC Activities Improve the Qualified Rate of One-Time Installation of UHPC Slabs

在线阅读下载全文

作  者:吴保华 吴艾林 徐乐 姚越 WU Baohua;WU Aiin;XU Le;YAO Yue(Jiangsu Dahan Construction Industry Group Co.,Ltd.,Xuzhou Jiangsu 221600,China;Jiangsu Vocational Institute of Architectural Technology,Xuzhou Jiangsu 221116,China)

机构地区:[1]江苏大汉建设实业集团有限责任公司,江苏徐州221600 [2]江苏建筑职业技术学院,江苏徐州221116

出  处:《工程质量》2024年第11期9-13,共5页Construction Quality

摘  要:在徐州市某新建项目施工过程中,为提高UHPC板一次安装合格率,项目部成立了QC活动小组,通过现状调查、原因分析等方法对施工现场UHPC板的施工质量情况进行调查,成功找出影响UHPC板施工质量的主要原因,针对要因制定了具体的实施对策。小组成员通过增加卡接槽板、开设限位孔及增加垂直度控制杆,显著提高了UHPC板的施工质量。此次研究成果不仅为项目创造了经济效益,也为该项目争创中国建设工程鲁班奖奠定了坚实基础。In the construction process of a new project in Xuzhou City,in order to improve the qualified rate of one-time installation of UHPC plate,the project department established a QC activity group.Through the current situation investigation,cause analysis and other methods,the construction quality of UHPC plate on the construction site was investigated,and the main reasons affecting the construction quality of UHPC plate were successfully found out,and specific implementation countermeasures were formulated for the main reasons.The team members significantly improved the construction quality of UHPC slabs by adding card slot plates,opening limit holes and adding verticality control rods.The research results not only create economic benefits for the project,but also lay a solid foundation for the project to win the Luban Award of China Construction Engineering.

关 键 词:UHPC QC活动 施工 安装 

分 类 号:TU767[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象