检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈昌盘 CHEN Changpan
机构地区:[1]福州新区元洪功能区投资促进中心,福建福清350314
出 处:《福建建设科技》2024年第6期66-69,共4页Fujian Construction Science & Technology
摘 要:本文以福清市某桩基工程为背景,采用声波透射法、抗压静载试验、钻芯法及高应变法等多种检测方法检测冲孔灌注桩在复杂地质条件下施工存在的质量问题,分析原因并采取加固措施,验证了加固处理后的效果,以期为冲孔灌注桩在类似地质条件下的应用提供有益参考。A pile foundation project in Fuqing area is taken as the background.Acoustic transmission method,compressive static load test,core drilling method,high strain method and other testing methods have been used to investigate the quality defects of construction of punching piles under complex geological conditions.The reasons and reinforcement measures are analyzed and the effect after reinforcement measures are verified to provide useful reference for the construction of punching piles in similar geological conditions.
关 键 词:冲孔灌注桩 检测方法 质量问题 处理措施 注浆 补桩
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.12.149.233