引洮供水工程一、二干渠病害修复方案  

Disease Repair Scheme forFirst and Second Main Canals of Tao River Water Diversion Project

在线阅读下载全文

作  者:杜亮 DU Liang(Gansu Water Investment Group Co.,Ltd,Yintao Water Supply Company,Dingxi 734000,China)

机构地区:[1]甘肃省水务投资集团有限公司引洮供水公司,甘肃定西743000

出  处:《云南水力发电》2024年第11期114-117,共4页Yunnan Water Power

摘  要:目前,引洮供水一期工程正式通水已有将近10 a,2023年相关主管部门对对一、二干渠进行了实地踏勘,发现混凝土结构出现裂缝、混凝土剥蚀、地基沉降等问题,针对以上发现的问题,提出了相关的处理方案。通过对引洮供水工程一、二干渠的修复设计,可以保证其供水的可靠性,提高其使用寿命。At present,the first phase of the Tao River water supply project has been officially connected for nearly 10 years.In 2023,the relevant authorities conducted a field survey of the first and second main canals and found problems such as cracks,concrete erosion,and foundation settlement in the concrete structure.In response to these issues,relevant treatment plans were proposed.By repairing and designing the first and second main canals of Tao River Water Diversion Project,the reliability of its water supply can be ensured and its service life can be improved.

关 键 词:供水 混凝土病害 地基沉降 除险加固 

分 类 号:TV332[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象