检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何轩 HE Xuan(QingyuanQingxin District Qingxi Flood Control Engineering Management Office,Qingyuan511500,China)
机构地区:[1]清远市清新区清西防汛工程管理所,广东清远511500
出 处:《云南水力发电》2024年第11期153-156,178,共5页Yunnan Water Power
摘 要:电排站作为关键的水利设施之一,其运行风险及除险加固改造提升问题备受关注。以山塘电排站为研究对象,对其运行风险进行深入剖析,同时对除险加固改造提升进行全面研究。通过分析,发现山塘电排站在运行过程中面临多种安全隐患和风险因素,如渗漏、建筑物沉降等。为有效应对这些问题,提出针对性的除险加固改造提升方案及措施。通过数值模拟、防渗效果评价等手段,对改造提升方案进行全面评估和分析,为方案的实施提供科学依据和决策支持。As one of the key water conservancy facilities,the operation risk and the issues of risk elimination,reinforcement,and upgrading of electric drainage stations have attracted much attention.Taking the Shantang electric drainage station as the research object,this article conducts an in-depth analysis of its operational risks and conducts a comprehensive study on risk elimination,reinforcement,renovation,and improvement.Through analysis,it was found that the Shantang electric drainage station faces various safety hazards and risk factors during operation,such as leakage and building settlement.To effectively address these issues,propose targeted plans and measures for risk elimination,reinforcement,renovation,and improvement.Through numerical simulation,anti-seepage effect evaluation and other methods,a comprehensive evaluation and analysis of the renovation and upgrading plan is conducted to provide scientific basis and decision support for the implementation of the plan.
分 类 号:TV87[水利工程—水利水电工程] S277[农业科学—农业水土工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229