检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张金来 陈冬瑞 ZHANG Jinlai;CHEN Dongrui(Beijing Corp.,Ltd.of China Water Resources&Hydropower Construction Engineering Consulting,Beijing 100024,China)
机构地区:[1]中国水利水电建设工程咨询北京有限公司,北京100024
出 处:《中国资源综合利用》2024年第11期79-81,共3页China Resources Comprehensive Utilization
摘 要:某抽水蓄能电站下库面板在施工期遭受极端暴雨天气,导致面板出现抬动和集中裂缝区域,检查面板水毁情况,分析其主要成因,结合现场实际地质条件和情况,确定了相关的面板修复措施,面板经过处理后变形及渗流稳定,有效的处理措施和注意事项可供同类工程借鉴。The panel of the lower reservoir of a pumped storage power station was subjected to extreme rainstorm weather during the construction period,which led to the panel lifting and concentrated crack area.Check the panel water damage,analyze its main causes,and determine the relevant panel repair measures in combination with the actual geological conditions and conditions on the site.The panel deformation and seepage stability after treatment,and effective treatment measures and precautions can be used for reference by similar projects.
分 类 号:TV223[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.24.18