铁路长大隧道下穿马家田尾矿库施工技术探究  

Exploration of Construction Technology for Railway Long Tunnel Underpassing Majiadian Tailings Reservoir

在线阅读下载全文

作  者:王义光 Wang Yiguang(China Railway 23rd Bureau Group Third Engineering Co.,Ltd.,Chengdu,Sichuan 610000)

机构地区:[1]中铁二十三局集团第三工程有限公司,四川成都610000

出  处:《现代工程科技》2024年第21期48-51,共4页Modern Engineering Technology

摘  要:攀枝花马家田尾矿库位于攀枝花市仁和区阿署达村,该尾矿库为原亚洲第一尾矿库,施工过程中采用了爆破、灌浆等一系列施工技术。以冉家湾隧道下穿马家田尾矿库为例,介绍了隧道的施工技术内容,包括隧道下穿尾矿影响段、下穿尾矿段、下穿引水洞段采取的控制爆破方案和注浆方案,希望能够为相关人士和同类工程提供参考。The Majiatian tailings pond in Panzhihua City is located in Ashuda Village,Renhe District.The tailings pond was originally the first tailings pond in Asia,and a series of construction techniques such as blasting and grouting were used during the construction process.Taking the example of the Ranjiawan Tunnel passing through the Majiadian Tailings Reservoir,this article introduces the construction technology content,mainly including the controlled blasting and grouting schemes adopted for the tailings impact section,tailings section,and water diversion tunnel section of the tunnel.It is hoped that this can provide reference for relevant personnel and similar projects.

关 键 词:冉家湾隧道 尾矿库 施工技术 爆破技术 

分 类 号:U455.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象