检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩创业 秦剑云 崔鹏飞 龙岩 HAN Chuangye;QIN Jianyun;CUI Pengfei;LONG Yan(Henan Energy Group Xinjiang Company Yushuling Coal Mine,Kuqa 842000,China;School of Mines,China University of Mining and Technology,Xuzhou 221116,China)
机构地区:[1]河南能源集团新疆公司榆树岭煤矿,新疆库车842000 [2]中国矿业大学矿业工程学院,江苏徐州221116
出 处:《煤炭工程》2024年第11期55-60,共6页Coal Engineering
摘 要:以榆树岭煤矿东翼下5煤层老空积水防治为工程背景,提出矿井地下水“复合勘查+定向探放”的工程技术,其中,矿井地下积水区域复合勘查技术方法包括宏观物探勘查、细观钻探勘查和微观化探勘查三阶段等,长距离定向钻孔精确探放水技术方法包括长距离定向钻孔装备工艺及钻孔布置设计等,并对工程实施效果进行监测评价,总体实现了老空积水的疏排,解决了工作面采掘布置的水害隐患。工程应用表明:实施“复合勘查+定向探放”工程技术共6个月,累计疏放老空水约22.6万m^(3),水压由1.42 MPa下降至0.9 MPa,放水效果良好。Taking the goaf of No.5 lower seam in the east wing of Yushuling Coal Mine as the engineering background for cumulation water prevention and control,the technology of compound prospecting and directional exploration was proposed.The composite exploration technology in underground water cumulation area includes three stages,macroscopic geophysical exploration,mesoscopic drilling exploration and microcosmic exploration.It also involves in long distance directional drilling precision exploration and drainage engineering scheme,covering long distance directional drilling equipment technology and borehole layout design.The implementation effect of the project was monitored and evaluated to drainage the goaf water and solve the hidden water hazard caused during working face mining and layout.According to the engineering practice,during the 6 months implementing the technology of composite prospecting and directional exploration,about 226000 m^(3) goaf water was drained,the water pressure decreased from 1.42 MPa to 0.9 MPa,and the water discharge effect was favorable.
关 键 词:地下水复合勘查 老空区积水 长距离定向钻 精确探放水
分 类 号:TD745[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7