考虑配电系统灾后响应全过程的开关配置与线路加固方法  

Switch Allocation and Line Hardening Method Considering Whole Process of Post Disaster Response of Distribution System

在线阅读下载全文

作  者:陈浩 孙锘祾[1,3] 吴桂联 秦超 卢嘉妮[2] CHEN Hao;SUN Nuoling;WU Guilian;QIN Chao;LU Jiani(Economic and Technological Research Institute,State Grid Fujian Electric Power Co.,Ltd.,Fuzhou 350011,China;Key Laboratory of the Ministry of Education on Smart Power Grids,Tianjin University,Tianjin 300072,China;Distribution Network Planning and Operation Control Technology in Multiple Disaster Superimposed Areas State Grid Corporation Laboratory,Fuzhou 350011,China)

机构地区:[1]国网福建省电力有限公司经济技术研究院,福州350011 [2]天津大学智能电网教育部重点实验室,天津300072 [3]多灾害地区配电网规划与运行控制技术国家电网公司实验室,福州350011

出  处:《电力系统及其自动化学报》2024年第11期100-108,共9页Proceedings of the CSU-EPSA

基  金:国网福建省电力有限公司科技项目(52130N23001G)。

摘  要:为应对日渐频发的极端自然灾害对配电系统造成的巨大威胁,提出一种面向韧性提升的配电系统开关配置与线路加固方法。首先,针对台风灾害,基于Batts风场模型与历史故障数据,生成典型灾害袭击场景集。其次,建立典型场景集下的韧性配电系统预防、退化及恢复三阶段综合响应和运行模型。通过构建考虑规划措施的故障传播约束,解析表征网络拓扑、故障位置、规划措施等与系统故障分布之间的关系。在此基础上,以最小化规划成本和灾害造成的失负荷成本为目标,提出考虑灾害影响下配电网响应全过程的开关配置与线路加固方法。最后,采用IEEE 33节点系统验证了所提方法的有效性和优越性。To deal with the serious threat to distribution systems caused by the increasingly frequent extreme natural disasters,a resilience-orientated switch allocation and line hardening method for distribution systems was proposed.First,the typhoon disaster was taken as an example,and a set of typical disaster scenarios was generated based on the Batts wind field model and historical fault data.Second,a three-stage(i.e.,prevention,degradation and restoration)integrated response and operation model of a resilient distribution system under the typical scenario set was established,in which a fault propagation constraint considering the planning measures was constructed to analyze the relationship between the network topology,fault location,planning measures and system fault distribution.On this basis,to minimize the planning cost and the load shedding cost caused by disasters,a switch allocation and line hardening method considering the whole process of distribution network response under the influences of disasters was put forward.Finally,the validity and advantage of the proposed method was verified by an IEEE 33-bus system.

关 键 词:开关配置 线路加固 台风灾害 网络重构 韧性配电网 

分 类 号:TM727[电气工程—电力系统及自动化]

 