检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李双凤 LI Shuangfeng(Shanghai Municipal Engineering Design General Institute,Shanghai 200092,China)
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海200092
出 处:《现代建筑电气》2024年第11期39-44,62,共7页Modern Architecture Electric
摘 要:分析目前净水厂电气设计、施工及运营管理中存在的若干问题,从负荷特点分析及负荷计算、供电电源、变电所设置及变压器选择、高低压变配电系统、电机拖动、谐波治理、电气节能等方面进行讨论,给出各问题的解决方案,并在优化净水厂电气设计以及完善水厂功能方面给出了建议。Several issues in electrical system design for water purification plants,emerged during design,construction and operation management,are analyzed in this paper.And then,the solutions to the above-mentioned problems lie in load analysis and load calculation,power supply,electrical substation and transformer selection,high-voltage and low-voltage power distribution,motor drives,harmonic suppression,energy conservation measures are given.Furthermore,we present some suggestions for power supply and distribution system design optimization of water purification plants,and for their function extension.
关 键 词:净水厂 供配电 负荷计算 供电电源 电机拖动 谐波治理 电气节能
分 类 号:TM714[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33