抽水蓄能电站高边坡施工技术分析  

ANALYSIS OF HIGH SLOPE CONSTRUCTION TECHNOLOGY FOR PUMPED STORAGE POWER STATION

在线阅读下载全文

作  者:王菲 刘红强 Wang Fei;Liu Hong-qiang

机构地区:[1]中建二局第三建筑工程有限公司,北京100070

出  处:《建筑技术开发》2024年第12期40-42,共3页Building Technology Development

摘  要:研究以某抽水蓄能电站进厂交通洞高边坡为分析对象,通过分析石方爆破、石方开挖中的施工难点及设计方案,整理出了高边坡施工工艺流程,对抽水蓄能电站高边坡施工技术进行分析,并对高边坡施工过程中遇到的问题及使用的施工工艺进行了总结,改进施工工艺,最终得到了成熟的施工工艺流程,该流程对后续高边坡施工具有重要意义,其可为类似工程提供参考。The study takes the high slope of the access tunnel of a pumped storage power station as the analysis object.By analyzing the construction difficulties and design schemes in rock blasting and excavation,the construction process of the high slope is sorted out.The construction technology of the high slope of the pumped storage power station is analyzed,and the problems encountered during the construction process and the construction technology used are summarized and improved.Finally,a mature construction process is obtained,which is of great significance for subsequent high slope construction and can provide reference for similar projects.

关 键 词:高边坡 石方爆破 抽水蓄能 

分 类 号:TU74[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象